Foldwell & Sprocket Books · Lead Paper Engineer
- Engineered fold-out and pull-tab mechanics for 22 titles, with a combined print run of 610,000 copies across 4 languages.
- Cut average pop-up assembly time on the factory line from 41 to 26 seconds per spread by simplifying a 6-piece parallel fold to 3 pieces.
- Trained 5 junior engineers on scoring, tab-and-slot layout, and the dummy-to-die-line handoff.