Deccan Alloys Pvt. Ltd.
Senior Metallurgical Engineer, Foundry Quality
- Cut scrap on the SG iron line from 7.8% to 2.1% by tightening Mg treatment windows and adding in-stream thermal analysis at 3 pouring stations.
- Requalified 2 ladle refractory suppliers after spectrographic drift; sulfur pickup fell from 0.014% to 0.008% avg over 220 heats.
- Wrote the plant's failure-analysis SOP (28 pages); fractography turnaround dropped from 9 days to 2.
| Heat batch | Nodularity % | Mg residual % | UTS MPa | Disposition |
|---|---|---|---|---|
| H-4471 | 91 | 0.042 | 512 | Accept |
| H-4472 | 88 | 0.038 | 498 | Accept |
| H-4479 | 74 | 0.026 | 441 | Reject · fade |
| H-4483 | 93 | 0.045 | 521 | Accept |
H-4479: 22 min ladle hold. Told them. Twice.
Mg fade past 15 minutes of ladle hold is the dominant reject cause on this line. Hold-time cap written into the pouring standard, 12 min max. Scrap has stayed under 2.5% for 14 consecutive months since.